Description
UPDATE: According to the MDT, the blasting work timeframe for tomorrow, 5/20, has been narrowed to noon to 2 pm.
BOZEMAN — The Montana Department of Transportation (MDT) and CK May Excavating will begin rock removal operations on Interstate 90 (I-90) near Bozeman Pass during the week of May 19. A 30-minute closure of I-90 and the West Bozeman Hill Road/U.S. Highway 10 frontage road is scheduled for Tuesday, May 20, between 9:30 a.m. and 3:30 p.m.
Due to potential interference from nearby train activity on the BNSF railroad, MDT cannot specify the exact timing of the 30-minute closure. Motorists who travel during this window should anticipate delays of up to one hour.
While only one 30-minute closure is expected per day, MDT will notify the public in advance if additional closures are required for rock removal.
Once the crews have successfully removed the rock and ensured the safety of the roadways, I-90 will reopen in both directions but will continue to feature single-lane closures and reduced speed limits.
Motorists can expect the following during the construction period:
- Flaggers directing traffic at various times
- One-lane traffic in each direction on I-90
- Reduced speed limits
- Possible width restrictions
For the most current updates on traffic conditions, including width restrictions and other controls, please visit 511mt.net.
News Source : https://www.kbzk.com/news/local-news/heads-up-expect-delays-on-tuesday-on-i-90-near-bozeman-pass
Other Related News
05/20/2025
A 24-year-old who allegedly attacked a man he mistakenly suspected of hitting on his girl...
05/19/2025
Thousands of people from Texas to Kentucky cleaned up Monday from severe weather that kill...
05/19/2025
HELENA It took until the final days of the Montana Legislatures 2025 session but lawmaker...
05/19/2025
President Donald Trump awarded the first Medals of Sacrifice posthumously to fallen Palm B...
05/19/2025